Cacheer line has gone seamless into productio after rebuilt to S7

Cacheer line has gone seamless into productio after rebuilt to S7

The retrofit from Omron to Siemens S7 is carried out perfectly. The installation brought totally into production after a week.

More project information

Retro fit S5 to S7

Retro fit S5 to S7

Again VerAutomation has rebuild a S5 to a S7. An S7-315 is used for the new control of the frying oven.

More project information

Retrofit Omron with remote I/O has been realised

Retrofit Omron with remote I/O has been realised

VerAutomation has managed to replace a total new operating system in a planned factory stop.

More project information

Upgrade operating equipment in candy factory Chicago USA

Upgrade operating equipment in candy factory Chicago USA

Outdated equipment from a large Candy factory in Chicago the United States has been upgraded to Allen Bradley SLC 5/05 with ControlNet communication.

More project information

S5 replaced in British paper factory

S5 replaced in British paper factory

VerAutomation has replaced S5 technology to Mitsubishi technology recently in a British paper factory.

More project information

Lemonade factory equipped with S7

Lemonade factory equipped with S7

Lemonade factory in Iran has been equipped with S7 technology. The outdated equipment concerned a Mitsubishi PLC.

More project information

Laminator Line Bakkersland

Laminator Line Bakkersland

Recently, VerAutomation has realized an automation project for the bakery Bakkersland. An existing lamination line for laminating dough which had outdated drives and control has been innovated using the newest available...

More project information

Mining company

Mining company

Big boulders that have been cleared from the mountain are crushed in the primary crusher. These smaller rocks are conveyed to secondary crushers. The secondary crushers break the rocks into sand...

More project information

Conversion PLC S5 to S7

Conversion PLC S5 to S7

An outdated weighing system that is being controlled by a Siemens S5 PLC in combination with a Nematron operator panel is being converted into a system that uses a Siemens S7-300...

More project information

Upgrade candy line

Upgrade candy line

Old candy line of S5 was upgraded by VerAutomation to 1 S7-400 and 9 Vipa 300 PLC's in very short down time